Everything your site needs before your unit arrives: slab dimensions, electrical service, and fuel supply. Get these right and your incinerator burns right from day one.
Pour a concrete foundation with 2–3 feet of extra slab on each side of the unit. Slabs should be poured at least 6 inches thick and dead level — level is critical for a proper burn.
| Model | Recommended Slab |
|---|---|
| ECO-250 | 8′ × 10′ · 6″ thick |
| ECO-500 | 10′ × 10′ · 6″ thick |
| ECO-750 | 10′ × 12′ · 6″ thick |
| ECO-1000 | 10′ × 12′ · 6″ thick |
| ECO-1500 | 12′ × 16′ · 6″ thick |
| ECO-2000 | 14′ × 16′ · 6″ thick |
| ECO-3000 | 14′ × 16′ · 6″ thick |
Standard 110 volt, 60Hz, 20 amp service — every model, no exceptions. No three-phase or specialty electrical work required.
Every unit is configured at the factory for the fuel you have on site: diesel, propane gas, or natural gas.
If you have any questions about safety, operation, servicing, or warranty coverage, don't hesitate to contact the factory at +1 (229) 439-4874 or info@ecoconcepts.org.